Production molding in a 12,000 m² plant that runs 24 hours a day, 6 days a week. Twenty-five presses from 60 to 2,000 tons, CMM-verified first articles and a QC record for every batch — from a short prototype run to millions of parts.
25
presses
60 – 2,000 T
clamping force
24 h / 6 d
production
The Process
What happens in one shot.
Thermoplastic pellets are heated to 280–320 °C, injected under high pressure into the mold cavity, cooled and ejected. Textures, polish, logos and screw bosses come straight out of the mold — no extra operations.
01
Clamp
The press closes the mold and holds it shut with 60 to 2,000 tons of force.
02
Inject
Molten resin fills the cavity through the runner and gate in a fraction of a second.
03
Hold & Cool
Packing pressure compensates for shrinkage while cooling channels set the part.
04
Eject & Inspect
The mold opens, the part is ejected by robot or hand and checked against the sample.
15 – 60 s
typical cycle time
Koneiden luettelo
Twenty-five presses on one floor.
Clamping force is matched to the projected area of your part, so you never pay for a bigger machine than the job needs.
25
Injection presses
3
Double-injection machines
12,000 m²
Molding facility
24 / 6
Hours / days per week
Equipment
Spec
Spec
What it does for your mold
60 – 200 T
10 presses
30 – 300 g
Connectors, caps, gears, lenses, small housings, medical components